Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Sir if i have 2kv ups in which 17ah 8 battries load 600watts
how much back up time i get and if i put 6kv ups with the
same no of battries same amp can i get more back up time
please give reply exactly what is the procedure to calculate
back up time for different kv,s

Answer Posted / krish

back up depending on you'r load so you have 17ah battery.
so u can put on the full load 600w taken 2.6A so this
is given backup for 6oow 6.5hr

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.

1494


Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?

2215


what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering

2131


what is the difference between switch yard to residential area.and how much required it.

1823


What is the effect of solar radiation on the design of an Isolated Phase Busduct?

2414


On Which Pressure PRV is operated.

1794


i want design of D.C.MOTOR 1HP 960RPM AND 2HP 960RPM ITS URRGENT

2017


how to carried out DAR test in 11 KV Alternator ?

2361


Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit

1581


How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?

2189


for what purpose the star point is done in ct

1462


pls tell us AC plant are how do work and parts name with picture

2007


what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor

2099


What is sensitivity of a measurement?

1184


A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is

1334