Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Dear sir,

we are getting voltage fluctuations suddenly for 2 or 3
minutes again it becomes normal. we checked each and every
connection some times we are getting 110 volts like that
from earth to neutral again it is reducing we are getting
supply from 45 kva DG set give earthing properly.

Answer Posted / k.prakashchandra

Unbalanced load can not be responsible for 110 V between
neutral and earth.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

solor panels arrange some angle,panel is flat fitted energy was produced or not why?

1894


What is the difference between the transmission line and distribution line?

1160


what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering

2060


when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?

2488


Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.

1741


how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.

2196


Sate maximum power transfer theorem?

1103


Why negative feedback is preferred in the control system?

1253


WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?

1972


What is non-minimum phase transfer function?

1295


What is notching in dc machine?

1987


What is the difference between rated and per unit in transformer?

2188


if voltage bt phase & nutral is 38v in a panel board . whats the root cause.

2309


If there are two transformer having rating of 2.5mva, 6.6kv/440v(satr-star),and the load is 600kw then what is better to maintain less losses in transformer having both transformer in parellel or only single transformer connected to load? Please give calculated answer

2701


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1092