How much percent dry volume consider for concrete

Answer Posted / akbar

1.54%

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does civil status mean?

771


How did the romans get water up hills using aqua ducts?

910


What is the average density of soil?

781


What is meant by a context menu in a cad software?

771


Explain the different types of building contracts?

749






qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1860


what are the Task work of different labour.?

2264


what is diversion?

1852


List out the potential risk factors for workers on the construction site?

734


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1707


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1899


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

1736


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

826


What are the applications of modulus of elasticity?

855


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1732