Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

Answer Posted / silpa

Cube Size=150 mmX 150 MM
Area = 22.5 Sqm.
Stress = Load / Area E
Eg : 600/22.5=26.26 N/mm

Is This Answer Correct ?    2 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3615


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

6331


Explain what are the phases inspections are done by local authority while construction?

1127


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2022


what is right & short method of measurement of slab&beam

2041


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1864


WHAT IS YOUR CURRENT SALARY

2167


What is Base Shear ?

1063


How to calculate 1 brss for RCC work  

2112


Spider cracks occur in beam bottom due to––

2068


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2247


For fine aggregate which is most suitable River sand or crusher sand & why ?

1740


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2159


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

2016


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1955