Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Specific gravity of Cement? Water?

Answer Posted / mushtaq ahmed

we know that

specific gravity=density of material/density of water (at 4degree Celsius)

the density of cement is around 1508kg/cum
and that of water is 1000kg/cum at 4degree Celsius

then it should have been 1.508
but it is 3.150 that i have seen.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the usage of zoom command?

1282


How can i display 5 asterisk and another 5 asterisk )?

2504


What are the different theories of failure under static load?

1295


How many square meter can a worker/labor demolish a structure per day?

2093


what is right & short method of measurement of slab&beam

2097


Are cruise ships built for the transatlantic run?

1247


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2621


What is missing report and how to prepare

1568


The 4 main factors to start a construction project are––

2267


How to calculate material and labor required for 100 m2 plaster?

1830


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

4070


what is anchorage length,lap length and (dont remember the last one)

2193


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1807


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2131


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2417