pt100 is a type of resistance temperature detector ( R.T.D.
).it is use for temp. measurement.resistsnce is linearly
vary with tempature. it has 100 ohm resistsnce at odegree
celcius.
Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
Explain mechanical rotational system?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
what is meant by directional earth fault and non directional earth fault? describe both.
What is resolver and glass scale in CNC how they work?
What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.
why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?
define the non synchoronism of synchoronous machine in general g or m??
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformerÂ
Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit
I want to do a mini project. Now I'm studying in 6th semis tor EEE Engineering.
What are the reasons for the parallel operation of transformers?
how to test power transformer.YNd11
I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR