Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Recently we had experienced following problem
All RCCB breakers (connected to the load as well as spares)
connected to various UPS systems at various floors at a
high rise building tripped during a power break down and
upon starting up of generator.This Generator is recently
inducted into the installation. Can any one explain the
reason behind this tripping.

Regards

Viswanathan

Answer Posted / k.prakashchandra

If it was the first time for the gen, then wrong leads to
the bus-bars is suspected.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How relay works, reverse relay, master relay, os relay, earth fault relay and what is its setting point

1865


if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.

1655


3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.

2712


If the feeder rating is 7.5 kw or 10 HP star-delta feeder, MCCB is taken as 63 a, contactors-32 a, how much will be the OLR rating or which range OLR should be considered when we concern about type-2 coordination?

2362


what is the responsibility of C license holder in industry?

9220


what r the safety measures in UPS ? explain all?

2265


I have two PLC processors. I want to communicate both processor with each other. How i can do so?

2210


What are the properties of a resistor?

1169


What is electrical diversity factor in electrical installations?

1269


i want to put single phase load on scott connected transformer,eventhough how to balance the transformer.

1907


What is precision of a measurement?

1166


Please tell me in DETAIL about the following 3 types of fuses or recommend me a good power system protection book or a website link ? 1.Dropout Fuse 2.Striker Fuse 3.Empulsive fuse (not sure if its impulsive or explosion fuse , sorry)

2147


what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????

3371


Why do we use copper cable for HT Supply and why not Aluminium?

2059


Form S and "c" license application both are same? @ tneb portal

1890