Quantity of material used for a Hollow block work
(400X200X200)?
1. Qty of HOllow block is 10 to 12 numbers / Sqm
2. Cement sand ratio preferable is 1:4
3. For 1:4 CM the cement, sand calculation as follows
Volume of mortor = Horizontal joints 5 rows of 200 mm wide
20 mm thick = 5*.2*.02 = .02 cum
Volume of verticaljoints : 5*2.5*.2*.2*.02 = .01 cum
Total = .03 + 30 % wastage = 0.039 Cum of Cement Mortor
For 1:4 ratio
Weight of cement in 1 Sqm = .039*1*(1/5)*1440 = 11.232
Kg /Sqm
Volume of Sand = .039*1*(4/5) = .0312 Cum = 1.11 Cubic foot
NOTE: But in actual it occurs more than the above
calculated values because many unskilled people filling the
hollow portions of the block. This is the wrong practice.
The Laying system is such that the hollow portion to be
overlapped with filled portion hence the hollow portion to
be maintained. This will give good heat reduction inside
the building.
For more queris mail me at ameerabic@gmail.com
K.Amirthalingam from Ariyalur
Is This Answer Correct ? | 134 Yes | 47 No |
Post New Answer View All Answers
What is Joule Brayton Cycle?
trapozidal
What is the l/d ratio of cantilever beam?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
In block work seawalls what is the purpose of slip joints?
what is the service corridor?
What is absolute coordinates?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
what is the ingredient value of 40mm and 20mm aggregates?
What is the best type of wood glue?
Differentiate first angle & third angle projection?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
List out the potential risk factors for workers on the construction site?
What should be the standard roof height like to be?