factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Please let me know what is the simplest way of Calculating Mix Designs
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Why is concrete cube test carried out?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to calculate steel for slab or footings?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
During reclamation how can the occurrence of mud waves can be rectified?
What is passive earth pressure ?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What is costing in 100squre feet bricks
In Rcc ratio calculation I wanted to know quantity of Steel also.
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S