How can we parallel two transformer with vector gorup YNd11
and YNd1?How is connection two transformer GT?
Answer Posted / k.prakashchandra
If phase sequence of YNd11 is RYB,then of YNd1, it may be YBR
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
how to get electrical supervisour certificate in gujarat
Define liftable weight of a transformer? Does the total weight of transformer include oil weight?
can we start slipring motor on star delta like we start induction motor ? if yes where will we connect ?
What is 100% protection of generator? Why 100% is not used but 95% is generally used?
difference between the applicability of nortons and thevenin theorem
Which types of gate insttaled in static switch. Please give me answer.
Why different Pressure switch used in marine boiler water circulation system
What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?
How many types of probe used in cro?
How to calculate total harmonic distortion level(THD) in VFD? and how can we reduce harmonics?
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
how we explain parallel paths armature winding?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
CBCT selection