how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / narsimulu r sanghi
The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum
Is This Answer Correct ? | 45 Yes | 41 No |
Post New Answer View All Answers
what is called the inverd level of mabhole chamber?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Are you ready to relocate with your immediate family to United States as a new employee?
What is an ice dam sock?
Which tests are performed on soil to decide the type of foundation to be provided.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
2nd and 4rt angle elevation used in which country ?
How to compute minimum number of columns required for a site from area of site?
pls give me some basic informations in construction of a structure?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What is quantity of cement and sand required for 2000sqft of tiling?
Define mirror?
what discoveries did you have in relation to your course?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix