How is rate analysis prepared for M 25 grade of concrete?
Answer Posted / fayyaz tabussam
calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.
| Is This Answer Correct ? | 15 Yes | 17 No |
Post New Answer View All Answers
How to calculate quantity of plum masonry in 1:3:7
what is the dimensions of river sand truck trailer or trolly ?
Are cruise ships built for the transatlantic run?
what is a well
How to decide/consider the grade of bitumen for dbm.
States some of the commonly used commands in cad software’s?
What is the use of array command?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Slump Values for works?
What are the main reasons for conducting pull-out tests for soil nails?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What is need for setting limits?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?