How is rate analysis prepared for M 25 grade of concrete?
Answer Posted / fayyaz tabussam
calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.
| Is This Answer Correct ? | 15 Yes | 17 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
For what purpose bedding is used under storm water drains, explain?
what is the water cement ratio for plastering
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
What are new methods /technologies of pothole patching?
Name the main components of a cad gui?
how to shuttering is used in slab
What is the biggest dam in america?
hi guys what happens if you are absent for a supplymentry exam?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6