Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why transformer called by KVA?

Answer Posted / fahad

bcoz the power factor of load is not known during the
manufacturing, this is also done during load calculation.
For reference you can see a indian book " B.L Theraja -
Electrical Technology" ....

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.

4291


draw singleline diagram of star to delta and dol starters

2257


what is the main function of capacitors in mccs.

1742


Connection diagram for KW meter and  Kva meter

2335


In control room of our one plant there is a continuously the incoming power goes to PC is vary,means in stabilizer it continuously indicate from high input to low and low input to high. what is the reason and its solution.

1974


What is the formula for selecting the cabels according to load? How to calculate what sq.mm cabel to be used?

1492


how a.c. genarator control power factor when its conected to grid supply by incrising or decresing excitation voltage.

3370


how braking & making capacity of circuit breaker are calculated?

2303


What is the control action?

1147


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2176


when ID fan will immediately stop through VFD what exactly cause and problem the ID fan

1455


for 100 HP Induction motor service factor is 1.2(SF) we placed a VFD at the motor side load is balance with 0.3 Amp's Phase to Phase but at incoming of VFD load is un-balance with 10 to 20 Amp's what will be cause of load un balance

1945


please send previous exams question papers

1829


for compensate 315mh inductance ,how many capaciance required?

2057


how can maintain the power factor and why and this is how do work tell us

2097