Answer Posted / madhava reddy n
Shuttering is a engineers technical term and centring is a
colloqueal name given by the shuttering carpenters. (like
prakruthi and vikruthi)
Is This Answer Correct ? | 12 Yes | 19 No |
Post New Answer View All Answers
Basic civil interview questionsÂ
How do you maintain water pressure?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
quantity of material needed for rubble stone masonry for 1:4 and 1:6
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
How much cum. Brick work can do by 1 madon
What is min thickness,min grade of conc & age of PQC ?
What is the use of array command?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.