Answer Posted / mzechlin
A typographical error; "Shop" testing should be correct.
It is the testing of equipment in the workshop under
controlled conditions usually using standard references.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Mr. mohh sahid m not satisfied for ur answer to the que weather the size of transformer increases or decreases withchange in fr for more detail go to the answer given by me
What is Servo Ventilated Motor?
TELL ME WHAT IS INDUCTOR AND CAPACITOR WHAT IS IT BASIC OPERATION ANDFUNCTION?
why we use sinosidal voltage / current instead of others in system?
Classify milling machines.
Parts of machine and their discription in details with suitable photo
what is the safety points of vaccum circuit breaker.
how can we change the polarity of Alternating current rapidly? how frequency of ac can be controlled and changed easily?
Dear sir, How to calculate 3.5 core pvc aluminium armoured cable meter wise carrying amps rating.Please give the solution with a good example.
What is an order of a system.
The slip during plugging operation is given by= A 1-s B 2+s C 1+s D 2-s
why steady state stability limit is greater than transient stability limit ? How it can be explained ?
What should be the percentage increase in length of the dead end clamp for bus bar conductor (Hawthorn) after hydraulic pressing and what should be the applied pressure?
is oil viscosity affect on motor current?
What is called limb of a transformer?