Answer Posted / chandu
There is no difference between centring and shuttering its
called shuttering for centring work.shuttering means
meterial and centring is a name of work.
| Is This Answer Correct ? | 6 Yes | 36 No |
Post New Answer View All Answers
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How is make concrete cube?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
How to take labor charges for construction of 1cum of concrete?
explain five benefits of using standard terminology in the measurement process?
how gradation of aggregates effect on slump of fresh concrete?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What is a kip?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
what is the 0 value in quantity surveying
Will water damage concrete?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?