Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between shuttering

Answer Posted / chandu

There is no difference between centring and shuttering its
called shuttering for centring work.shuttering means
meterial and centring is a name of work.

Is This Answer Correct ?    6 Yes 36 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2607


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

2155


How is make concrete cube?

1247


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2409


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2139


How to take labor charges for construction of 1cum of concrete?

1230


explain five benefits of using standard terminology in the measurement process?

2231


how gradation of aggregates effect on slump of fresh concrete?

2435


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1638


What is a kip?

1258


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2136


how to disign cuplock shuttering and it's matireal requirement snd any related web site

3071


what is the 0 value in quantity surveying

2439


Will water damage concrete?

1364


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2361