Answer Posted / shaik abdul
Shuttering means form work & centring means reinforcement
work
| Is This Answer Correct ? | 28 Yes | 71 No |
Post New Answer View All Answers
Explain the advantages and disadvantages of using plastic and timber fenders?
what is your role of in previous company as a construction manager
what is flashing?
What was asked in isro civil interview
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What are the causes of building collapse?
What is Architect-Prepared Contract?
what is the relation between pitch of steel and depth of slab?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What are the basic use of runners and standards of pipelines?
how to calculate the density for high density concrete ? or is it same as the density of RC?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Define the various stages of the project planning process in construction.