What is meant by 'zero value' in quantity surveying.
Answer Posted / sathy
Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)
| Is This Answer Correct ? | 91 Yes | 13 No |
Post New Answer View All Answers
what is BPM in concrete demolition hammers. what is better a higher value or lower
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
When was the first motorway built in england?
What is the crank length in the slab?
What is modular elasticity?
What is the procedure of concealed plumbing in toilets?
what is the construction cost for per cft of multistorryed building in kolkata?
define the strength
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
questions with answers to face an interview of an civil engineer regarding RCC buidings
sir please send me campus placement questions in civil engineering
What is dead load impact load live load
how calculate the bearing from two coordinates?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?