What is meant by 'zero value' in quantity surveying.
Answer Posted / sathy
Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)
| Is This Answer Correct ? | 91 Yes | 13 No |
Post New Answer View All Answers
What are your future hopes for this job?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how to find quantity of concrete in PCC M15
Please tell me vasthu room sizes. Thanks.
What was asked in isro civil interview
What is the difference between a wood shake and wood shingles?
what is floating slab foundation?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
how we can find sieve #4 is 4.75mm?
for pretensioning which will yield first and same for post tensioning?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
How much of the strength of concrete comes from post- production curing?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering