Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do we calculate the building footing calculation ?

Answer Posted / sachin kesarkar

FOR RECTANGULAR FOOTING VOLUME= L*B*H
WHERE L=LENGTH B=BREDTH H=HEIGHT
FOR TRAPEZOIDAL FOOTING VOLUME=h/3(A1+A2+ROOT A1.A2)
WHERE h=HEIGHT A1=TOP SURFACE AREA A2=BTM.SURFACE AREA.
THERE ARE ALSO THE FOOTINGS WHICH ARE NOT PERFECTLY
TRAPEZOIDAL, IN THAT CASE WE HAVE CALCULATE IT WITH
TRAPEZOIDAL HAVING 5% VARIANCE.

Is This Answer Correct ?    20 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Whats the meanig of ,'K' VALUE in the case of soil.....

2066


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

2165


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

3075


pile load testing procedure

2289


Can inverted beams used in pipes during construction?

1387


What is zoning permit?

1264


what is escalation?how it is done?

2571


Explain the different types of roofing systems?

1309


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

1316


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1823


Rate analysis of Vitrified tile in cement mortor 1:3

4533


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1864


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2131


How you can turn off the display for dimension in CAD?

1135


what is the breaking strength of wall tiles

2582