why we not connect the 12 V batteries in parallel to get
the more backup supply for an UPS ? wheter off line or on
line UPS ?
Answer Posted / romeovictoriano
Arranging batteries in series is to configure the required
voltage. After configured the required voltage by series
connections a parallel connections of the series connected
batteries is arranged to a limit that it will not induce
overcurrent to UPS System, otherwise it will cause
overcurrent and damaging UPS System.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how can i apilly for electrical c licencese.sir,i completed B.Tech in electrical & electronics engineering in 201onot working any company
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
need to make a report. Need to choose a 3phase induction motor. Load conditions motor will operate in : Maximum Load: 30 Kw Speed: 2950 rpm Ambient temp: 20 cent Supply voltage: 440V Frequency: 50Hz need to look for the safety factor when choosing the motor, went through catalouge found a few, but dont know how to choose the safety factor allowing an extra load something above 30 KW to avoid any harm.
in my working site. momentary jerck in electrical supply ocurred frequently which cause of multiple losses in our electrical equipements. how can we protect our electrical machines and equipements in this situation.
EXPLAIN USE OF ROCKING ARRANGEMENT IN ELECTRIC HEATING?
how electical engineer is related to apsrtc (general) post? if they ask a question in interview as why did u choose this job what shd be answer
As we use capacitor bank in 3ph ckt to improve PF, can we use capacitor in single ph domestric use, in house we have Fan,Mixer,electric cooker,iron,tube choke they also lag the system,because it is inductive load. if it is possible to improve PF of single ph system-- if yes- type of capacitor to be used,connection diagram, working in detail. if no-- list it.
what is the responsibility of C license holder in industry?
Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?
stand by earth fault protection (51G) for transformer rating 2000 kVA,Dyn11,33/0.400 V. LV NCT ratio and necessary resistor and metrosil values how to calculate
what is the usage of microcontroller in the panel board?
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
How wire size can define in electrical wiring? What is the ratio?
why we use condenser in the thermal power plant, althrough the same vapour will be again heated
what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel