what is the specification for silt content in sand
Answer Posted / dharmendra
x is the initial mark , but after adding water and waiting
for 1 hr then we have to take the SAND+SILT = A ml , and
then the only sand level say B ml
silt content = (A-B)/B *100
AND (X-B)/B*100 is BULKING OF SAND
| Is This Answer Correct ? | 39 Yes | 16 No |
Post New Answer View All Answers
Explain the advantages and disadvantages of using plastic and timber fenders?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is construction mitigation management?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is progress payment?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is the compressive strength of fly ash bricks?
How to construct a water sump in a rocky soil?
Who built the sears tower?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how clculate excavated or backfilling quantity by simpson's rule
Sir how to find cutting length for footing steel bars in the shape of "u"
Differentiate orthographic and isometric projections?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?