how many average of shuttering in one cubic meter concrete

Answer Posted / dalip kumar

for shuttering point of view, there is area of concrete work is important rather than it's volume, e.g. 1 c.m concrete
can be spread on the 2 sq.m and 1 sq.m that is why it design by covering area of the concrete.

Is This Answer Correct ?    2 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1499


in the construction of residential building what type of tank are used?where?why & what is its purpose?

1913


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

1512


What are the uses of groynes?

682


Describe the sections included in a typical bill of quantities

1794






why the openings of sieves are square io size?

1100


what is the theoritical percentage of concrete cubes testing per day?

4395


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1237


How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight

1441


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

695


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1349


What are the uses of alloys in daily life and how are alloys made?

866


what are the values of compressieve strenght?

1601


why we use 19x9x9and 20x10x10 but not other

1743


What is the software used in civil engineering?

665