When do you prepare Requirement Traceability Matrix(RTM)
before testing aor after completion of testing?
Answer Posted / kishore
we are preparing RTM before the test execution is started
(or)after all the test cases are prepared.it is prepared by
test lead.
| Is This Answer Correct ? | 17 Yes | 7 No |
Post New Answer View All Answers
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
whar are the contents in db testing test case template
What’s the difference between verification and validation in testing?
What is system level testing?
What is test driver and test stub?
What is a defect age?
1. what is baseline document , can you say any two ?
What Is risk Based testing?
what is metrics in software testing? give me a brief detail about it?
what are metrics and what are metrics did u collect in you are project
What is Wound Fixing?
I have 2 years of exp. in testing and looking for a change if any body knows, about any vacancy in testing then plz contact me on deepti_ac@yahoo.co.in
What is srs and brs document?
can anybody send the project you have tested with the clear descriptions,and recent bugs u found in that
Explain the procedure & path of s/w in testing?