If i want to increase Dialog WP in process what is the
procedure to increase the Dialog WP?
Answer Posted / rahul
hello Buddy,
if you want to increase any work process it's a static, so
you need to do change below parameter using T-code RZ10.
in this scenario u need system restart.
Profile parameter rdisp/wp_no_dia=X(x is ur dialog work
process number).
Note: the no of dialog work process should be equal or more
than other non-dialog work process.
same as above we can change remaining work process:
rdisp/wp_no_btc (Background).
rdisp/wp_no_up( update)
rdisp/wp_no_up2(update 2).
rdisp/wp_no_Enq(Enque).
rdisp/wp_no_spo(Spool).
hope above info useful for you.
Br,
Rahul
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Explain checkpoint?
While doing implementation do you get any issues?
What is the information derived from OSS notes?
What is the purpose of tdevc ?
what is the difference b/w 4.7EE & ECC5.0?
How can a user be able to access only for Customizing requests even if assigned se01 and se10?.
What do you understand by transport management in sap basis?
Explain deletion flag?
What are saplpd and tcp/ip print server and purpose? And difference b/w saplpd and tcp/ip print server?
How to apply java stacks ? expalin step by step prcoess
What is a developer key? and how to generate a developer key?
How many times bdls transaction executes for 2 clients
Does any one have SAP basis B1 Resume format for 4 to 5 year experience? if any one have please send me on kishorekharche@gmail.com
How to transport objects from Production to Development?
How to do transport at OS level?