Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

different between horse power and break horse power

Answer Posted / k.prakashchandra

I think BHP is the net HP available at brake drum.It
normally applies to self-propelled vehicles which employ
clutches,gears and shafts/chains/belts to transmit power to
wheels from the engine.It is equal to HP of the prime mover
minus HP lost in transmission or it can be called as
effective HP

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you mean by dependent and independent voltage sources?

1091


15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help

1621


Whether power factor should be high or low? Why?

1179


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2085


How to select the proper VSD to operate high inertial load

1787


Why i receive the GCU fault in my DG Sychronization panel . what all the factors considered for this fault .

2276


Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.

2102


what are the pecularity of shaver sockets ?

1967


Why synchorised generators are used for the production of electricity?

1223


hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /

2028


what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?

2302


What are the advantages & disadvantages of a group electrive drive?

2203


how is calculated the quantity of weight in hot test xlpe?

2554


can i connect REF and Differencial relay in 1 CT core for transformer protection?

2008


WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?

2241