What is the difference between the stock transfer between
two plants belonging to same company code and those
belonging to
different company code?
Answer Posted / vsssekar
Hi,
The difference depends on the valuation level that is
maintained. Meaning whether the valuation is done in the
company code level or in the plant level.
Based on this setting the creation of accounting document
and the material document will vary.
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
What are the plant-specific data in material?
What is purpose of safety stock in mrp view in material master?
What are the initial configuration steps for inventory management?
What us purpose of unit of measurement in basic data, sales data, and purchase data. Same thing can be maintained differently at three places.
What is a 'factory calendar'?
How is material information structured in material master records?
What is mrp (material requirement planning) and what is the transaction code to access mrp list?
Under which business scenario split valuation is used?
What is the difference between cbp and mrp?
How will you consider sub contracting po components which are not sent by your company to vendor but they are added by the vendor (sub contractor)?
How to delete a material completely?
What are the plant-specific data in the material?
Pls guide me to choose to MM cource (SAP) in Mumbai or N. Mumbai
Explain batches. How would you search them?
Explain rtp