Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is 100%
protection of
generator? Why
95% protection
is used not 100%?

Answer Posted / dayanidhikinkar

since few turns of wdg have very small voltage therefore
fault current flowing through secondary of CT is less than
preset value for relay operation.Hence relay will not
operate for that much portion of winding.

Is This Answer Correct ?    11 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between electronic regulator and ordinary rheostat regulator for fans?

1020


What is the range of the stator resistance of 3 phase induction motor?

1892


Please brief working principle & construction of permanent magnet AC Servo motor

2228


hey guys help me out.....what  are the industrial uses/functions of nozzles in industries 

1579


How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?

1915


how does it help for selection of a transformer.

1851


Why GRR starts from 60% of motor speed why not less than 60%?

1697


how to electrically make connection to ferroli GN2N?

1934


what is the reason the main breaker is trip during the motor is running? (some time the breaker is not trip)

1782


how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical

2565


Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.

1759


the problem faced on star or delta winding connection??

1914


How to control motor gearbox speed and friquency? If length of cable and dia given, how to measure the voltage drop?

2032


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1778


Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?

2105