Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why normally Generator rating are between 11Kv to 22Kv?

Answer Posted / vinod singh

now a days power is generated by using powerformers in some
contries at higher voltage. in england on lule river power
is generated at 30KV . and ABB is also planning to
manufacture powerformer to generate powerat 45KV.
morover power is generated at 26KV in mundra by tatapower

Is This Answer Correct ?    7 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why the active power flow of some line is increased when the active power of out is cut ?

2116


whats the application of voltage regulation? and whats the voltage regulation's device?

1955


Why can't we parallel Voltage transformer secondary circuits?

1704


if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current

1794


i need about 10 years of GATE solved papers in pdf format and even mock tests toooo

1715


1.ZEBRA conductor(large size) 2.KUNDHA conductor( small size ) 3.panther conductor(very small ) 4.lepard conductor (very very small)

2964


by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.

2029


it is possible to rotate the DG engine dc starter with wrong polarity connections? why?

2310


What is the Resposiblity of Electrical Utility Engineer

2988


what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker

5477


What is the actual calculation for transformer short circuit test?.

2514


why we have and use 3 phase not 2 or 4 or other in power system?

2167


What is the permissible limit of shaft voltage for 6.6 KV motors ? Why? Is there any standard is available?

2731


Differentiate between induced emf and self inductance?

1213


33kv substation lay out details & line to line & line to earth measurements

2673