Input power is 380 - 450 V but with 45 - 55 Hz frequency -
desired output is 415 V and 50hz with 1% variation
permissible. CVT / Servo dont stabilize the Frequency -
what is best solution??
Answer Posted / k.prakashchandra
Frequency is dependent on the prime mover, the speed
regulation of which, is very bad.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
11 kg trivevter meter has rating of -/5amps. And pt ratio11000/110v and is connected with 11kv ct/pt unit of cr ratio 75/5amps. And pt ratio of 11000/110v while checking accuracy of meter with HT Accuchek meter what value of PT ratio and CT ratio to be filled in Accuchek meter
What is open delta Xformer? It's adavntages & Use?
sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com
The electrical energy required to raise the tempreture of a given amount water is 200 kwh. If the heat losses are 20%, the energy required is?
hi friends ,iam working as genset AVR service engineer in electrical field from past 2 yrs throughout india . i plan to shift in some other job without travelling in same field because i con't travel,i dont know what i do for that so please guide me what job is suited for me,how i can serch the job please anybody helpme iam totally confused
how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???
What are protections for dty type transformers
how meger function
What is the simplest formula to calculate the rotor diameter of a synchronous generator?
Dear sir, iam completed iti ncvt electrician 2000-2002 & diploma electrical eng completed 2008-2010 distance education in rvd university, still i got B licences only but my working company want C licences, how to i get c licencese pls reply me iam in critical situation thank you karthick 9841637803
where rlc series ckt used?
what you have to see after one week or month from the day of installation of transformer ?
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)