Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHY WE CAN GENERATE POWER IN 3PHASE MODE ONLY NOT IN 4 OR 5
PHASE?

Answer Posted / ahmed.adel

in the mathematical solution any 3 forces are equaled in
magnitude and shifted with each one with 120 degree the
equivalent is equal to zero so we could have line that
called nuteral.the capability in 3 phases only the voltage
to neutral and line to line voltage

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

List the power rating of any 5 important electrical appliances used in houses.

2057


Explain what cmos is and its benefits?

1102


stand by earth fault protection (51G) for transformer rating 2000 kVA,Dyn11,33/0.400 V. LV NCT ratio and necessary resistor and metrosil values how to calculate

2808


What is the Good Earth resistance value of G.I & Cu. Chemical Earthing & Normal Pipe Earthing?

2347


What is slip in an induction motor?

1158


how meger function

2893


wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?

2014


what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?

2399


How to calculate the sag on transmission Lines.

3013


george phenomenon of synchronous machine

7561


Can u Explain about the electronic trivector meter and the use of data converters in them?

2370


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1806


1) why a dg set shows variation of power factor and load when synchronised with other dgs? 2)Why the load sharing is not become equal in all dgs?. 3)When a dg set will not run on auto start?

2007


all interview questions with answers of ntpc (2000-2009

2218


Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.

4490