How much steel required in 1 square feet slab?
Answer Posted / sameera
2 To 2.1 Kg/Sqft
| Is This Answer Correct ? | 13 Yes | 16 No |
Post New Answer View All Answers
115mm thickness brick work how to required mortar
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What applicable rate of wct in bihar
What is the density of most of construction materials?
What is braced excavation all about?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the tensile strength of 10swg and 8swg gabion wire?
I need to constructive work in amaraj batteries
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how to remove the quantity of metal 1 and metal 2 in concrete
How to calculate 1 brss for RCC work
what is detail procedure of eccentric footing? plz. give solved exmple?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is pre-stressed concrete?