one rtd sensor which is connected at middle of distillation
column where actual temp. is 100deg but when we tight this
sensor at thermowell end it goes down to 90 deg & when
remove from the thermowell(but sensor end dipped in well)
showing actual reading, what is reason?
Answer Posted / ashwin jain
when the RTD is loose, the RTD probe direct contact to
thermowell body so RTD giving the temp.(100 deg) but when
we tighten with thermowell there is sum gap or space
between thermowell body & probe,so temp down to 90 deg.
also check the OD of thermowell.
OD of thermowell > RTD
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to work MIL contol valve posistioner ?
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
i have done DAE in Instrumentation and Process Control. i have applied for an apprentice training in chemical company after three day my interview will be conduct but i need more information about industrial process control and controller. my e mail is imran_dilsetu@yahoo.com please tell me interview question relative to instrumentation ?
What is the Working principle of Dozing valve?
How does work A temperature valve or fv control valve in process plz brief me
sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.
give me the formula for analog to digital converter and also d to a converter
why we use cascade control and feed foreword control in 3 element control of boiler drum ?what is feed forward and cascade control system ?
Hook up resistance decade box to temp.transmitter.
Why not come out analog output in ABB EL3020 when display show correct value
If P will increase then what will happen with PID?
In turbine what does term CDP, NI, NH, HSSOC means.
Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .
-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.