Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Two electronic energy meters are connected to seperate
phase wires, but connected to a looped neutral. Are these
going to function correctly?

Answer Posted / karthik

yes, if the the 2electronic energy meters are connected
under the same distribution substation it will work, but if
the 2 energy meters are connected in diffrent substation it
will not function properly, becuse neutral only carrying
return current for the single phase loads, if u connect
your elcb getting trip.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....

2225


sourse is 66 KV / 350 MVA, transfarmer is 1000 KVA 6.6 / 0.415 kv, iF fault is 28.75 MVA on 0.415 KV Bus then calculat the Transfarmer Impidance

2148


what is the usage of microcontroller in the panel board?

2137


what are problems caused by the pdu in rack server

2032


List some examples of renewable energy?

1276


What are the advantages of skewing of cage rotor conductors?

1277


What is distance between electrical panel to land ?

1634


What it the purpose of parallel phasing transfomers??

2041


If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!

1877


How to calculate earth wire load by formula

2636


In siemens PLC, why do we want to move the data ?

2369


at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.

1721


how to calculate transformer load?

2530


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1854


sir i want previous entrance exam papers for written test

2203