Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the problem, if a circuit breaker is not closing.

Answer Posted / baikunth

1. spring may not charged. control supply may missing.
breaker is not at service position.trip is activated or any
external interlock inhibiting the switching.
2. no
3. to save the breaker
4. for human safety.

Is This Answer Correct ?    27 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it

2709


I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?

1674


Dear Sir I am living in Jaipur Rajasthan  now I did complete my b tech degree in electrical engineering in 2012  Sir how I gate certificate of competency for electrical supervisor

1989


What kind of maintenance is conducted for Transformer

2271


which IS or IEC is used for earthing,breakdown voltage of transformer oil, hv/pd testing and all type of electrical testing

2601


how is the connection of a 3 phase ct trivector meter done on a pole mounted transformer

1355


Dear Brother can u tell the proper size selection of cable & the fault level calculation of braker, busbar etc. pls mail me at azeemk30@gmail.com

1925


What is load boxes ?

2153


sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah

3964


The specific heats of the gas at constant pressure and constant volume are respectively 1.0 kJ/kg K and 0.72 kJ/kg K; the value of R for the gas is

1136


How to design the NGR Resistance

2072


and gate circuit diagram,amplifier circuit diagram

2063


3Cx240 & 3Cx300 sqmm Al. cable from lv side. What is the calculation for this cable??

1395


Define corner frequency?

1194


hello friends this is krunal here.. i have applied for he officer train in hpcl electrical stream.. any one who have applied before for electrical stream please help me out.. post ur reply to my mail id: krunal_airforce@yahoo.com.. any tips, old questions for paper or any help will do.. plz help me.. your faithfully, Krunal Darji

1887