Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if one of the phase is failed to 3 phase IM. what will happen?

Answer Posted / paddu241

It will continue to rotate with synchronous speed.

Is This Answer Correct ?    4 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the reasons of CT circuit faulty in busbar protection scheme?

1474


HOW TO CALCULATE ELECTRICAL, MECHANICAL,& OVERALL EFICIENCY OF GAS ENGINE POWER PLANT

2009


is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1716


how do we calculate length of starting time and repeated starting of a direct online starter?

1980


How can you sized or estimate the ligthning arrester current rating?

2135


Why use the vcb at high transmission system ? Why can’t use acb?

1325


How dia computation perfomed in cold rolling mills .

3064


What about electrical Units. discrive in detail

2097


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

10458


how to caculate cable size for diff types of loads? if anyone know the calculating procedure please tell me

1439


What is the percentage loss for aluminium wire for HT line more than 11KVa

2129


How can you calculate the size of the down conductor cable for the lightning protection system. Is 70mm2 cable can replace 95mm 2 bare copper cable when the copper tape size is 25Wx3 thk mm.

5392


why is using sensor?what is differece between photoelectric and proxmitty?

2005


some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?

1764


Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.

2386