1.one earth fault will not affect the generator more. but at
the same time if another earth fault happened it's dangerous.
2.We can test this relay by using Resistance Pot.
3.Apply the Aux supply and connect the resistance pot across
the terminals where we taken reference from the generator.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how copper and aluminium wires or cables are choose for current rating? please provide copper and aluminium wire selection chart for different current rating ?

1574


i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?

1579


who many types of fire explane with exmple

1740


(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?

1588


How to use earthing on shipments.

934






UG cable sizes were specified in sqmm. But practically its not coming to mesure. What's the reason for that? And how they specify the size of the cable?

1477


what is the formula for efficiency of francis turbine and generator for hydropower? what is best way to select francis turbine and generator?

1996


If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?

1419


Where burned of electricity,when,who, & why.

1505


How to calculate the sag of OPGW during stringing???

2146


What is domestic transformer? Draw the connection of domestic transformer.

1852


could you measure current in parallel?

689


what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor

1476


If 100 KAV USP dedicated earth got disconnect / Cut. What will happen at load.

1495


substation+ plc system

1626