Is it alright to connect more than one RCCB of same rating
in series for a three phase equipment?
Answer Posted / k.suresh
it leads more maintenance and more work during
fault.also,series connection will not give additional
protection and some time we may face neusence tripping.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to measure power in 2 or 4 or n phase circuit? Please give me a formula.
How to resolve if Diesel generator stop while running ?
how to select diiferent power transformers of same capacity on no load loss and full load loss by economical point of view.?
How many types are using in 220kv/400 kv swith yard
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
The size and construction of bushings in a transformer depend upon?
What is the difference between cylindrical-type and sandwich-type winding?
Working of microwave oven?
What is the abbreviation of NGT panel
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
how can motor both beasrings insulation resistance can be check?
How to test REF relay testing for LV panel as per Kahramaa standard?
Define demand factor?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram