Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between Autodesk revit structure and
STAAD pro.? How much it is useful to structural engineer in
modelling, analysis & design of RCC and Structural steel
structures than STAAD pro.?

Answer Posted / gp

Revit structure is a Building information modeling software
especially used for structural analytical modeling so that
it can be exported to major design and analysis software.
This eliminates the necessity of creating analytical model
in a design software. Apparently, Revit structure is not a
design/analysis software. But it is not only used for
exporting to design. Building projects can be completely
modeled with all structural and non-structural elements and
the general arrangement drawings (2D & 3D views)can be
exported to AutoCAD for further use like detailing if
required. Sectional and Elevation views can be extracted
from the model anywhere and at anytime within seconds.

STAAD pro - as far as I know, is used for design and
analysis.

Is This Answer Correct ?    35 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

94680


what is tension & compression of steel bending.

2317


what are the duties of Site Engineer in work site?

1634


why we use 19x9x9and 20x10x10 but not other

2161


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6585


how to identify np3 pipe and np4 pipe

2058


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

2435


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

1262


How you read 5x3x1 #4 @ 20" 0/C in steel structure?

1521


RR masonry rate analysis

3354


what is mc arther pile?

2254


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1525


What is proportion of PCC Grade G?

2048


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2107


what is Bearing Capacity,How to determine it?

1279