define IDMT relay?
Answer Posted / er. mohammed yusuf fahad
The IDMT Inverse definite minimum time relay is one such
type of relay where the delay time of the relay is
inversely proportional to the magnitude of the fault
current. For ex. If the fault current is of the magnitude
of 8KA the delay taken by the relay to tripp the ckt may be
3 sec likewise if a fault current of 16KA persists in the
system the IDMT delay time will automatically reduce to 1.5
sec and so on. It is used in applications of overcurrent
relays and earth fault relays.
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model
why high speed tripping relay will be used in tripping circuit why not normal relay
electrical knowelge
HELLO EVERYONE, I RECENTLY HAVE FOUND ONE PROBLEM, I WAS TAKING NO LOAD TRIAL OF AN HT MOTOR 920 MOTOR , 1440 RPM , 6.6 KV, WITH AUTO TRANSFORMER. AT 450 V, LOAD WAS 40 AMP AND SPEED WAS 250 RPM. BUT AS WE INCREASE VOLTAGE FROM 450 TO 480V, LOAD BECOME 41 AND SPEED REDUCED TO SOME RPM . SO WHICH PHENOMENON ACTED HERE FOR REDUCING SPEED.?? AND IS IT HAPPENING ALWAYS OR IT IS RARE? I ALSO HAVE FACED SUCH PROBLEM WITH FEW LT MOTOR ALSO.
What is precision of a measurement?
I have been using an 600VA with 0.6 p.f UPS with my desktop which has 450W power supply unit. Can anyone explain how can this happen . Because the output of the UPS is 360W (600*0.6) (<450W)
which metal is use in shunt
DERIVE AN EXPREION FOR MAXIMUM POER TRANSMISSION, WHAT ARE ITS APPLICATIONS.
In Plumbing services What are accessories we consider for a bathroom?
How to calculate the electrical load for a standard telecom BTS shelter and choose the DG set capacity for the same load?
What is cathode ray oscilloscope (cro)?
How much ph is maintained of water resistance starter for slipring induction motor ?
There is air in a room . the top and bottom of the room are at constant temp. T1 and T2. DRAW THE temp profiles if a. T1 greater than T2 b. T1 less than T2
what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing
how to calculate cooling requirement of datacentre from electrical load?