define IDMT relay?
Answer Posted / er. mohammed yusuf fahad
The IDMT Inverse definite minimum time relay is one such
type of relay where the delay time of the relay is
inversely proportional to the magnitude of the fault
current. For ex. If the fault current is of the magnitude
of 8KA the delay taken by the relay to tripp the ckt may be
3 sec likewise if a fault current of 16KA persists in the
system the IDMT delay time will automatically reduce to 1.5
sec and so on. It is used in applications of overcurrent
relays and earth fault relays.
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
How do we calculate transformer oil in liter from the rating of the transformer.
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
What are the components of feedback control system?
what is the reactance,capacitance & impedence electrical armoured & unarmored Cables.
what is meant by IGBT how they differ from tyristor ?
What is the capacity of the Fastners 12mm?
What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker
Battery is a voltage source? give one example of current source and why?
how to calculate kvar in Akiva
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
why magnet has north and south poles only why not east and west and why we are considering as north and south poles? why cant we consider as east and west?
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
I completed iti in2004 I was worked in A grade contractor can I get c licence