Answer Posted / sanjay u ojha
crush sand are made by rock in majority. however near the
source of river it is produce by sand pebbles. crush sand by
pebble are almost round in shape however of rock is angular.
sand using pebble can be used 100% for concrete and of rock
shall be @50 yo 70%. However due to ban in maharashtra by
environment dept, now a days 100% crush sand are used for
mix design.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how much need sand and cement for 1 cft roof construction?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Draw the cross section of a boundary wall and label its part with detailing?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is difference between engineering stress and true stress?
Describe the role of independent Quantity surveyor?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
how many time use of plywood shuttering and IS code
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
How much of the strength of concrete comes from post- production curing?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
Which are the top apps for you civil engineer?
Spider cracks occur in beam bottom due to––
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh