Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we not connect the 12 V batteries in parallel to get
the more backup supply for an UPS ? wheter off line or on
line UPS ?

Answer Posted / k.prakashchandra

back up time depends on storage in batteries =VxAH.In
series voltages add up and in paralllel AHs add up

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?

1933


List examples of voltage source?

1044


3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.

2659


work of choke in florocent tube circuit ?

2140


What are the protection required for Transformer, motor, Line, Generator, capacitor, that all i have to refer which standard?(Like Transformer detail IS 2026)

2017


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2034


Mention what are the types of semi-conductors?

1217


What are the two types of compensation?

1164


what is PID control in VFD drives?

2002


Iin ESP why positive is grounded ? why not negative ?

2661


What is mason's gain formula?

1301


What is the best thing to protect the motor from running over full current. CT or O/L or pressure transducer at the given pressure rating

1544


Explain the following and how these are working with PLC Unit 1 I/O Module Card 2 Adaptor Card 3 Ribbon Adaptor 4 I/O bus 5 I/O Devices

1627


Why transformer used in UPS??

1607


volts=230 c=10mf a=??

2043