how to calculate amount of materials for concreting and
plastering?
Answer Posted / karthi
For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3
Total = 1.872 m3
= (1.872/1+4) = 0.374 m3
Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 =
1.496 m3
| Is This Answer Correct ? | 22 Yes | 4 No |
Post New Answer View All Answers
hi guys what happens if you are absent for a supplymentry exam?
What is the per cu. mt. price of ready mix in Gujarat region.?
What will be weight of 0.5mm GI sheet per sq.ft?
What are the steps involved in the concreting process?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
What is an ice dam sock?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
I need to constructive work in amaraj batteries
all technical question
punj loyed and sapurjl palanjl
I what know about life time of frp tank plz explain about it specifications & other details
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
How many types of slabs are there & how to design it?