How to calculate Cement, Sand and Kapachi required for M20,
M25
Answer Posted / k.prakashchandra
volumetric proportions for M20-1:1.5:3 and M25 -1:1:2
| Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
What is Architect-Prepared Contract?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What is the tallest man made structure in the world?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how i can tak Quantity of mortar in block work
difference between trapezoidal and pedestal footing and how the load acts on that
what is concrete canvas?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
For what purpose bedding is used under storm water drains?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what is thumb rule for calculating the size of ISMB required for a particular length of span