If connected load of Asphalt plant is 375Kw. What suitable
KVA DG set is required. What is calculation formula. what
extra load have to consider. in what efficiency it will
work.
Answer Posted / syed.yaseen
dear friends,
Given kw = 375
suitable kva = 375/.8 =468.75
Future extra load consider = 20% ie.. 93.75kva
total kva = 468.75 + 93.75 = 562.5
as per company designed capacity preferred is 625kva dg set
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
when ID fan will immediately stop through VFD what exactly cause and problem the ID fan
Give atleast 20 alternating current apparatus and devices.
1hp= how much rpm
What is the difference between PS & metering CT (5p20,0.5 etc.)? Why in PS class CT only Vk is given ? Is PS class CT is more accurate than metering CT?
what are symmetrical and non symmetrical components in electrical installation.
where does 22kv line starts
how to revers the direction of single phase motor
132/6.6ππ πππππππππππ πππππππ πππ πππ πππππ πππ πππππππππ. πΈ'ππ πππππππ πππππππππππ ππ 6.6ππ/415π πππ πΈ πππππππ πππππππ ππ ππππ πππππ πππ ππ ππ 13/6.ππ πππππππππππ?? πΈπ π½π.. ππππ π ππ’??
What does the term βvoltage regulationβ means?
how slip power recovery system work
What is the function of attenuator in cro?
why we are using Load factor?
WHAT IS LOAD CELL
in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
What is EHT tariff or Power factor Tariff ????