You can calculate the max time to use a UPS with this
formula
T max = efectiv energi / average power of the energy
that min
T max = 1377 (this is a constant, it's so big because it's
calculate in seconds)* capacity of batery in volts 12V *
capacity of batery in amper's 10Ah or other valu * number
of moduls (number of bateris to use) / how mutch power you
want to consum in W
for exemple
I have 8 baterys with 12V and 10Ah and I want to standup a
computer with 300 W consum
so
1377*8*10*12/300 = 4406.4 seconds that min 4406.4/3600 =
1.2h
sorry for my english
best regards,
Claudiu from ROMANIA
The sours is
http://en.wikipedia.org/wiki/Uninterruptible_power_supply
| Is This Answer Correct ? | 29 Yes | 16 No |
Post New Answer View All Answers
Dear Sir/Madam, I have one questions we have three steam turbines and one Gas turbine and our industry linked with the public network, we have protection system one of the protection is reverse power we can export just four MW only i would like to ask about how to calculate the reverse power. Thank you in advance best regards
Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????
Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?
what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me
how does an encoder work???
what is the vvvf in the dumbwaiter?? or lift. what is the actual process?/
How to calculate multiplying factor of dc energy meter
what are the difference between AC lamp and DC lamp
what is size of 3phase 4wire cable to be used for 11 ton ductable A.C and how to calculate cable size for different load
What is the capacitance values of 132,220,400 & 765 kV current transformer
Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT?
If 100 KAV USP dedicated earth got disconnect / Cut. What will happen at load.
can any one know is sbi interview based on merit or based on roll number
How to select a cable size for particular load?
Briefly describe your ideal job?