Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHY ARE THE LT GENERATORS SOLIDLY EARTHED WHILE THE HT
GENERATORS ARE EARTHE THROUGH NGR OR NGT??

Answer Posted / sanjay kolambekar

Small Generator's are usually a low voltage or
highimpedance in case of HV generator with lower rating
hence the fault current will be less and equipments can
withstand the same. Where as in case of HV Generators with
larger ratings the voltage level is high or the impedance
is low hence the fault current is much higheer. In order to
limit the Fault current to the required level suitable
rating of resistance needs to be introduced between the
Generator neutral and Earth.

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is high and low cut off voltage of BB and DG at SPS????????

1514


what is sustainable current of any conductors . a bare busbar or pvc cable has different sustainable current .

1822


What is resolver and glass scale in CNC how they work?

2325


I am about to write exam in RRB bangalore for the post of section engineer.please provide me with previous exam questions

2198


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

2035


what is model question rrb junior engineer electrical gr.II

1999


which one is more efficient, torq, power & ecnomy with the same frame size AC motor / DC motor?

2233


What is Tachometer used to measure?

1316


What is meant by load angle of an alternator? Upon what factors does the load angle depend?

3054


What do you mean by the zone of protection?

1136


How they LT panel busbar size choose

1734


what is the relationship between current&voltage in practical purpose ?

5096


Why in ESP Positive earthed

3146


How to megger test 11 kV cable and the acceptance IR value

3036


Why the magneti fields are not passes from southpole to north pole