What is the difference between switch gear and control
gear ?
Answer Posted / ujjwol
Lets take an example of 12 kV switchgear Panel. Generally they are internally housed. It consists of VCB,CT,PT inside itself. We dont have CTS or PTs or CBs outside in the switchyard for 11 kV.
Let us now consider 33 kV or 66 or 132 kV panels...they consist of Control & Relay panels for controlling equipments like CBs and DS. Its because CT,PT and breaker are located on the switchyard (external)while only the control panels are internally housed.
So the switchgear consists of CB+CT+PT +C&R Panel
while control gear just consists of Control & Relay panel only ..
HOpe u get it...
| Is This Answer Correct ? | 21 Yes | 21 No |
Post New Answer View All Answers
What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
What is an automatic controller?
does buccholz in a transformer use batteries
Testing procedure of DG alternator stability test
What is the meaning of dedicated earthing?
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.
what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?
how to apply b license to c license in tneb
IF ANYONE HAVE ANY QUESTION ASK ME AT MY MAIL anmol.bhardwaj5@gmail.com
What are the criteria shall be considers for sizing Fuse and MCB? If the rated current is 10Amps what should be the fuse size / MCB Size?
1. What is maximum permissible distance between smoke detectors ? 2. How do we decide number of smoke detectors required in a large office, warehouse, hall etc ? 3. What should be maximum height of smoke detectors ? 4. Where do we use heat detector, optical smoke detector, temperature sensitive detector ?
If breaker is undefined position, first step to do.
Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.
Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?