when will the position neutral axis shifted in beams
Answer Posted / a.k misra
basically when we draw stress vs strain curve.......
then we assume neutral axis bt try to find exact axis to know
% of steel
op section is under-reinforced or over -reionforced
in both cases neutral axis will shift
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
Why should you consider yourself fit to be hired by jindal steel.
material used for mendrel use to bend epoxy coated rebar
What difference comes in constructing of house and a housing complex like society
What are the methods of measurement? Describe it shortly
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Questions related to civil.engg in company
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
How to marking the building
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS