when will the position neutral axis shifted in beams

Answer Posted / anand858

when Ast is incresed

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2075


What is the cost difference between site mix and ready mix concrete per cubic meter

1443


what is the painting co efficient of slope roof tiles?

1451


what is idealized curve for concrere and steel

1865


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

91610






Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1373


How much cement will require for 1Rmt Skirting laying

1892


TELL ME THE EQUATION FOR OGEE SPILLWAY

2176


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1134


what is the theoritical percentage of concrete cubes testing per day?

4395


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

702


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6113


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2747


what is the difference between prime coat and tack coat in road construction

4497


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2435