what are IS code for
M20, 25, etc
Answer Posted / chandra prakash shrivastava
IS 456 - 2000
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What do you mean by bond? What are the different types of bonds?
During reclamation how can the occurrence of mud waves can be rectified?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How much quantity water should be placed in one cubic meter area?
how to calculate freeboard in under ground water tank and technical details
Differentiate first angle & third angle projection?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
All aptitude question of Bechtel
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Which is the direction of negative angle?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster